Mid-May

Apparently I never posted this… so here’s what happened over here in May.

Several weeks ago: my dad came over last Saturday for a couple hours. Our goals were to finish the sink plumbing (the one that had rusted through) and then level the floor. Of course, we got started considerably later than planned, so…

My dad had gone to the real hardware store and the guy gave him a fernco that should work. We had to make a gasket out of these little rubber sheets (my new favorite plumbing lifesaver) and this tape. Then my dad clamped the fernco on tightly over the gasket and the old pipe and voila! Solved! Now that we had that figured out, we could get to the floor leveling.

So the floor… it is hard to put in to words just how wonky this floor is. The tub is level. And the subfloor is 4 inches lower in the corner by the toilet than in the front of the bathroom door. It sinks two inches over the bathroom doorway alone. Gah. There is no indication it is moving still, but last weekend we added some braces to insure it doesn’t. My dad calls this the “belt and suspenders” approach which is a vast improvement over the previous homeowner’s “no belt, no suspenders, and probably no pants” approach.

By the time my dad headed home for dinner, we got the section by the toilet level, the new subfloor installed, and the toilet reconnected (again) – still wobbling away on a temporary platform because clearly #wearethatfancy.

Fast forward to Monday evening (yes, a full two days later), I’m working on the jagged floor vent in the bathroom (which is maddening and took 3 trips to the home improvement store to not find a solution) and suddenly I can’t help but notice the bathroom smells like sewer gas… I look over and the fernco that had been tightly installed is now sitting a couple feet away on the floor and the hole (thus the sewer gas) is sitting open. Great. So I guess that isn’t the solution we need after all.

I think I’ve figured out the solution, and believe it or not, it isn’t simple (shocking) and it is going to require removing some more drywall. This will mean all but the drywall on the wall behind the toilet is being replaced. And that piece isn’t in great shape …. Mmm hmmm. One step forward, one backward. That seems to be how it goes over here.

The Next Week:

That Saturday, I cut the old cast iron plumbing stack out, ripped out the unsecured and rotting stud walls surrounding the old stack, and figured out what I’d need to do to get the new stack in place. I put in the new fernco on and the new sink connection, but still need to plumb the stack up through the ceiling and out the roof.

Yard season is starting up again and it is feeling like everything needs to happen right now!! Gah! So I did some yard clean up during the week, mowed a couple times (different parts of the yard). I figured out some other details that I needed to think through (bathroom closet, where I need electrical, what I need to buy for the plumbing stack, etc).

The following week:

Saturday was go time. My dad had lined up a Grandpa sitter (my mom is out of town) so we’d be able to hit it hard on Saturday and get the floor finished up and maybe even the plumbing stack out the roof.  Instead the sitter canceled, complicating our plans. I got up early and pulled the remaining drywall and insulation off the walls on either side of the patio doors, filled the trailer with demo trash from the deck, removed the rest of the drywall in the bathroom, cleared the building materials from the clogged dining room to the deck so we’d have more room to work, and pulled out saws and tools.

My dad and Grandpa showed up around 11:30. We hitched the trailer up and Grandpa got to ride along with me for some errands so my dad could work on leveling out that floor. Grandpa was a good sport for the ride, told me what a good driver I am repeatedly (obviously it bears repeating), and waited patiently as I unloaded the trailer into the dumpster. We went from there across town to pick up something for a job at work, and again, Grandpa waited patiently at the lumber yard. But that long drive through line at Wendy’s nearly did him in. By the time we got back to my house, he was tired from all the running around (or waiting in the car) and was ready for some good ole’ Tiger’s baseball. I covered him with a blanket and he was on the edge of his seat (figuratively) to see if the Tiger’s could pull off a win in 1968 when they were down by 3! (Spoiler alert: They do win). Grandpa is not always content to just sit and watch by himself, so the fact that he was content to do so was a huge gift. What a guy!

Late afternoon, my brother Donal and his family showed up so CK could run the hills with his buddy Daisy. They visited with Grandpa, Donal helped my dad for a bit, and CK ran the hills and “helped” with the project. He loves a good project! CK removed a few nails with his tiny hammer, picked up nails with the magnetic stick, and then uninstalled and reinstalled my heating vent about 100 times. Always such a help!

By dinner time, my dad had gotten the new subfloor installed and leveled (except one piece on the end that I needed to redo). Woooooooo! LEVEL SUBFLOOR!!! I made a run to Lowes to get the plywood I needed for that one remaining tricky piece, ate some leftovers for dinner, and promptly fell asleep on the couch. Like a boss.

Sunday I got that final piece of floor in and the rest of the floor screwed down. I framed in the new closet wall and plumbed the vent stack back up into the ceiling. Apparently my dad doesn’t trust me to cut into my roof by myself (which I find moderately amusing) but if he is that concerned, I can wait for him on that. In the meantime, getting that closet framed means I can move on to install backerboard for the tile and get a floor in. Wooooooooooo.

Leave a Reply